Cookies

We use cookies to ensure that we give you the best experience on our website. You can change your cookie settings at any time. Otherwise, we'll assume you're OK to continue.

Durham University

COSMA

COSMA News

27/2/23: This news feed is now no longer used!

9/2/22: COSMA back in production

7/2/22: COSMA downtime starts

18/12/21: MPPHEA paper

2/12/21: /cosma8 back in production

29/11/21: /cosma8 storage issues

6/10/21: COSMA uptime

4/10/21: COSMA downtime

1/10/21: COSMA8 commissioning period officially ends

1/7/21: COSMA8 commissioning period has begun

20/6/21: COSMA8 HPL run gives 1.37PF (at 280kW)

20/4/21: AMD Milan node (with 128 cores, 1TB RAM and MI100 GPU) goes live

10/4/21: COSMA8 power-on

1/4/21: COSMA8 integration starts

1/3/21: COSMA becomes a Dell Centre of Excellence

4/2/21: COSMA back from downtime

28/1/21: COSMA network link severed between Durham and Leeds

26/1/21: Updated OneAPI module installed

16/12/20: DiRAC-3 system ordered

5/10/20: COSMA downtime starts

21/9/20: COSMA8 Compute nodes powered up, with novel on-chip cooling

7/8/20: COSMA8 service nodes brought into production

3/6/20: COSMA downtime completed

15/5/20: COSMA seems to have survived (so far) the world-wide HPC attacks

14/5/20: All users must regenerate SSH keys and upload to SAFE

17/4/20: GCC 9.3 and Intel 2020 (update 1) compilers now available for use

1/4/20: BlueField cluster ready for users (first 4 nodes)

16/3/20: x2go installed on login nodes to aid remote working during COVID-19

2/3/20: 16-node BlueField delivered and racked (awaiting power cables).

28/2/20: New database server for virgodb delivered.

5/2/20: Permanent host for V100 GPU cards identified

5/2/20: New COSMA5 storage online - from nearly 30kW down to 1.5kW

5/2/20: COSMA is alive again!

3/2/20: COSMA in downtime... back soon

25/11/19: New COSMA6 storage in service across all of COSMA

19/11/19: New COSMA6 storage in service on COSMA6 nodes

11/11/19: New COSMA6 storage migration ongoing

12/10/19: COSMA back into production

7/10/19: COSMA downtime has started

24/9/19: V100 GPUs are ready for use

23/9/19: Advance warning: COSMA downtime starting 7th October

20/9/19: Two NVIDIA V100 GPUs (32GB) have arrived, will be installed shortly.

6/9/19: Lydia Heck's retirement day today! She departs on the 11th.

30/8/19: New COSMA5 storage has arrived. This will be installed and put into production shortly

22/7/19: COSMA awarded funding to replace old /cosma5 storage

15/7/19: COSMA4 /gpfs file system powered down for good!

12/7/19: At risk period, 16th July (UPS upgrade)

3/7/19: COSMA login nodes have a fast 10GBit/s link to the outside world

20/6/19: Old data transfer nodes retired from service

7/6/19: New data transfer node with 20GBit/s connectivity added, dataweb, funded by a CO2 reduction scheme

7/6/19: New login node added, login7c

6/6/19: COSMA back in production

3/6/19: COSMA Downtime

2/5/19: Sheffield GPU Hackathon in August: http://gpuhack.shef.ac.uk/

2/5/19: COSMA5 queues reopened after hardware failure a few hours earlier

22/3/19: 152 new COSMA nodes added to COSMA7 queues.

20/3/19: COSMA7 storage outage due to failed PDU. Now operational without data loss.

4/3/19: 152 new COSMA nodes functional and undergoing tests

12/2/19: COSMA downtime from 18-22nd Feb for installation of new hardware

1/2/19: COSMA awarded funding to replace ageing COSMA6 storage

4/1/19: COSMA7 now expanded to 300 nodes, 230TB RAM.

2/1/19: COSMA welcomes users to a new year!

21/12/18: COSMA5 storage back to full redunancy in time for Christmas

19/12/18: New COSMA7 nodes in test queue, undergoing testing

18/12/18: COSMA5 queue back up after storage hardware failure: no data lost (18 HDDs replaced)

11/12/18: COSMA7 expanding to 300 nodes shortly

10/12/18: Carbon fund application successful: 5 servers will be replaced with one new one

5/12/18: COSMA selected for testing proof of concept systems

19/11/18: COSMA7, part 2, the DiRAC 2.5y Memory Intensive system is due for final installation this week.