John C Bennett

I left the City of Bath Boys School aged 18, with no immediate ambition to attend University.
I commenced an Engineering Apprenticeship with Westinghouse, an engineering company in Wiltshire, The course included part-time study at the N W Wilts College of Further Education, studying for an Higher National Certificate in Mechanical Engineering. After 3 years of the ONC/HNC course, with encouragement from my tutors, I applied to King's College in the University of Durham to participate in the Mechanical Engineering course in the Faculty of Applied Science. I commenced my studies in September 1955.
The majority of the students on the course had come to University immediately after leaving school, but there was also a fair number of mature students who, like me, had had some years of industrial training and part-time study.
I had applied for a place at Henderson Hall, at that time, the only Hall of Residence in Newcastle for male students. I was not granted a place and therefore spent my first academic year in 'digs' in Whitley Bay. I applied again to Henderson Hall at the end of my first year and was granted a place. I spent my 2nd and 3rd student years as a resident of Henderson Hall and during this time made a number of enduring friendships.
The students of Henderson Hall had a regular association with the lady students of Ethel Williams Hall. Several joint social activities took place and it was at one of these social events that I met Denise Kenny, a Medical Student, who was eventually to become my wife.
I graduated from Kings College in the University of Durham in July 1958 with a BSc. in Applied Science.

In Sept. 1958 I re-commenced employment with Westinghouse at the company Head Office, at Kings Cross London. I was employed there for 2 years, engaged as a Design Engineer in the design of the re-signalling of Pelaw Railway Junction in County Durham. In 1960 I was posted to take up the role of Resident Engineer responsible for the installation and commissioning of the Pelaw Project.
The company was also engaged in the re-signalling of the railway line from Newcastle upon Tyne to Berwick on Tweed and I was one of 3 Resident Engineers employed on that project.
In 1961 I was engaged by the company as Resident Engineer for the installation and commissioning of two automatic marshalling yards - one at Stockton-on-Tees and the second at 'Healy Mills, near Dewsbury.
Denise and I had 2 infant children by this time and were resident in a flat at Sands House, Mirfield.

In 1963, I was appointed to take up the role of Construction Engineer, responsible for the installation and commissioning of a number of remote control and telemetry projects. These included a number of water and gas pumping stations, the remote control of all of London Transport rectifier stations and the refurbishment of Lots Road Power Station Control Room.

In 1965, I was recruited by Preece, Cardew and Rider, Consulting Engineers as a Resident Electrical Engineer on the Mangla Hydroelectric Project in West Pakistan.
I was engaged on that project for 4 years, being responsible for over-seeing the construction and commissioning of 4 - 100MW generating units, a 132kV and a 220kV switchyard and all of the associated control and protection equipment.
In 1966, I achieved Membership status with the Institution of Mechanical Engineers, MIMechE and with the Institution of Electrical Engineers..
As my career progressed and I was employed in more senior roles, I applied and was granted Fellowship status in 1977, FIMechE and FIEE.

In 1969, I was engaged by Messrs. Merz and McLellan, Consulting Engineers, as Resident Commissioning Engineer at the Longannet Thermal Power Station in Fifeshire, Scotland. This involved the testing and commissioning of 4 - 600 MW generating units, generator transformers and switchgear and the associated control and protection equipment.

In 1972, I was transferred to the Merz and McLellan head office in Newcastle uopn Tyne, where I was engaged in the design approval for all Mechanical and Electrical aspects of the proposed 600 MW Kariba North Hydroelectric Project in Zambia.
I was to be appointed as Senior Resident Electrical Engineer for the Kariba North Project, but commencement of these duties was delayed by a civil war of independence which commenced in Zimbabwe and which involved guerilla groups operating from Zambia.
In the interim I was requested by my employer to take up the role of Resident Engineer responsible for the construction and commissioning of 4 - 330 kV substations in Zambia. I established a base in Kitwe, in the Zambian Copperbelt and from there supervised activities at the Chingola substation and at Kitwe, Kabwe and Leopards Hill, near Lusaka.

In 1974, I eventually took up my post as Senior Resident Electrical Engineer at the Kariba North Project, where I was responsible for the supervision of all aspects of electrical engineering associated with the 600 MW generating units and transformers and the 330 kV substation. The responsibilities also included all control and protection facilities for the generation plant and the switchgear.

In 1976, I was approached by my ex-employer, Preece Cardew and Rider, who offered to re-engage me, on completion of my Kariba North duties, as Manager of the PCR Hydroelectric Department.
I commenced the role as Manager of the PCR Hydro Department in mid 1976 and shortly after was promoted as an Associate to the Partners.
For the next 20 years I continued to act as Manager of the Hydro Department involved in the design, specification, installation and commissioning of the following projects;

Lungga Project, Solomon Islands - Feeasibility Study, Design & Specification.
Rouna 4 Project, Papua New Guinea Design and Specification
Kalabagh Dam Project, Pakistan - Feasibility Study, Design & Specification.
Victoria Hydroelectric Project, Sri Lanka - Feasibility Study, Design & Soecification, Installation and Commissioning.
Mangla Hydropower, Pakistan - extension of 2x100MW units, Design, Specification, Contract Administration, Installation and Commissioning.
Kekreti Dam, Senegal - Feasibility Study.
Mambilla Hydro Development, Nigeria - Feasibility Study.
Jinnah Barrage Project, Pakistan - Feasibility Study.
Kiambere Project, Kenya - Implementation of 2x72 MW development.
Turkwell Gorge Project, Kenya - Implementation of 2x52MW underground hydropower development.
Kilembe Small Hydro Project, Uganda - Design and Implementation of refurbishment.
Ewaso-Ngiro Project, Kenya - Study and Design of 190MW hydropower development.
Pergau Hydro Electric Project, Malaysia - production of design and tender documents, followed by implementation of 600MW underground Hydropower project.

During this 20 year period, Preece, Cardew and Rider had merged with Ewbank and Partners, Consulting Engineers and I was appointed an Assistant Director and continued to act as Manager of the combined Hydropower Departments.
In 1994 the combined Partnership were incorporated into the Mott MacDonald Group and I was appointed Divisional Director of the Power, Civil and Hydropower Division.

In 1995 I took early retirement from the Mott MacDonald Group in order to commence practicing as an Independent Hydropower Consultant.
Over the next 12 years I was engaged by various international funding agencies, eg. IBRD. EBRD, ADB, ODA, JBIC and others, providing advice on a number of Hydropower developments as follows;

Mobuku 3 Hydroelectric Project, Uganda - Feasibility Study, Review Consultant for Design and Implementation, witnessing of Commissioning and Performance Testing and post-Commissioning problem solving.

Ghazi- Barotha Project in Pakistan - Member of Board of Management of Pakistan Hydro Consultants, responsible for overview of design, tender evaluation and project management of a 1400MW project on the Indus River.

Marun Hydropower Project, Iran - Review of outline proposals for M&E aspects of Project. Review of Specifications and Contract Documentation. Assistance to Purchaser in Contract Negotiations for Main Plant Contracts.

Corpus Christi Hydroelectric Project, Argentina/Paraguay - Pre-Feasibility Study for a 2880MW Project on the River Parana. Preparation of Design Concepts for a 48 unit Bulb Turbine installation.

Almatti Hydroelectric Project, Karnataka, India - Review of proposals for a 297MW private hydropower development.

Honjiadu Hydropower Project, Guizhou Province, China - Participating in an Asian Development Bank review of the Design and Tendering proposals for a 540MW hydroelectric project on the Wujiang River in South West China. The commission also included the preparation and presentation of a seminar on 'International Procurement Procedures for Hydroelectric Generating Plant'.

Casecnan Multipurpose Project, Philippines - Review and Report on Specifications for a 2x75MW private Hydropower development in Central Luzon.

Nam Theun 2 Hydroelectric Project, Laos - Review of Design Proposals for all Mechanical & Electrical Plant and HV Transmission facilities to connect the project to the EGAT grid in Thailand.

Kanaker Hydroelectric Project, Armenia - a KfW funded rehabilitation Project. Engaged as a hydroelectric specialist to carry out an audit of all hydroelectric elements of a 102MW, 6 unit station, part of the Sevan-Hrazdan Cascade. - Involvement in preparation of detailed Specifications and Tendering Documentation. Also involved as Consultant's Representative for first phase commissioning of refurbished plant.

Dhauliganga Hydroelectric Project in Uttar Pradesh, India, funded by the Japan Bank for International Co-operation - Engaged as a Member of the Panel of Experts by the National Hydroelectric Power Corporation of India for the provision of expert consulting services.
The Project included an underground 250MW Power Station and Substation and outgoing 220kV transmission lines.

John C Bennett, BSc, CEng, FIMechE, ex-FIEE.
Mechanical Engineering 1955- 1958